November 15,
2006
The home has
progressed to the point where the plywood is installed in the areas
over the garage door and the porch overhang. The electrical has
been roughed in as well and the plumbing. The HVAC is also
roughed in with the ducting in place and the register openings in
place. Also installed are the facias and the vented soffits. The
shingles where to be installed today but (you guessed it) the 35mph
winds didn't help any so we will try again
Thursday.
Pictures of the garage
area, the covered porch area and some of the plumbing and
electrical.

The next update will be pictures with the shingles in
place and hopefully the windows installed. I think the progress
is outstanding especially since it has been ONLY 4 weeks since the
"Home Package " was delivered.
November 18, 2006 YES
WE HAVE SHINGLES and should have windows in the week of the
24th. HAPPY THANKSGIVING EVERYONE
!!!!! |