This
Front Elevation picture is of the home that is going to be built in
Central Texas.
The grading work
will start Sept 12, 2006 and we will have a lot of ground and sand
brought to the lot to make it buildable. The floor plan below is of
the home.
The Panelized
Home package is ordered and should arrive in approx. 4-6
weeks. The picture below is of the property before the grading
begins. The "footprint" of the home is 71'x 71' and as you can see
it is not an easy to build floor plan.

These pictures
are of the lot in the process of grading the property to
proper grade for the foundation to be built and the concrete forms
being layed.
The next step is to
have the plumber rough in the plumbing and then the rebar will be
put in and concrete will be poured.
September 19,2006
October 3,2006 More footers dug in
foundation and rough in of plumbing complete. Ready for re-bar and
concrete if the weather cooperates!! Scheduled date to pour concrete
10-11-06. More pictures to come.
Below are pictures of the actual foundation
being poured and finished. This happened on October 12 2006 one
day behind schedule because of the rain.
 10-12-06
The Home package is to arrive 10-18-06 which
has the panels and walls. There will be two loads and will be
unloaded and assembly will begin. Ahead of schedule for the
Home Package!!
Check back Often to
see the progress of this project .
|